On a building site, what is still done by hand
Work asked for by word of mouth, a scribbled slip, a signature that comes at the end of the month, an invoice redone in Excel: between the site, the office and site supervision, everything still goes through someone.
Daywork slip no. 27
Today's daywork slip for Les Arolles, building B: an opening in the basement wall for the ventilation duct, asked for this morning by the architect. Photo of the wall attached.
Slip no. 27 · Les Arolles, building B
- Tue 16:43Slip filed under the site, with the photoArchitect's order, noted on the spot
- Tue 16:44Hours priced at the contract's daywork ratesMason, labourer, core drill · CHF 1'245.00 excl. VAT
- Tue 16:45Report sent to site supervisionA link to sign, no account needed
- Wed 07:50Site supervision's signatureWork asked for out loud, to confirm
Illustrative example: a job done on daywork, from the site to the invoice. The foreman fills in the slip on his phone, the office retypes nothing; site supervision signs.
In the example above, the architect asks on site for an opening in a basement wall. The foreman fills in the daywork slip on his phone: the order, the hours, the machine, the photo. The office has nothing to decipher, the hours are priced at the contract's daywork rates, and site supervision signs from a link. Every signed slip then goes into the month's daywork invoice. Your site software stays in place: what is missing is the slip's way to the signature.
The example, step by step
Daywork order
BeforeAsked for out loud on site, nothing in writing
AfterNoted on the spot: what, when, who asked
Daywork slip
BeforeScribbled slip, deciphered at the office
AfterFilled in on the phone, readable at the office
Sign-off
A person decides
BeforeSent at the end of the month, then disputed
AfterSite supervision checks and signs
Invoice
BeforeRedone in Excel, some daywork forgotten
AfterAll signed daywork goes into the invoice
What is already covered, and what isn't
What your software already does
- Bids, quantities and CAN positions
- Daily reports and time tracking, when the crew uses the mobile module
- Signed daywork reports in the app, with some vendors
- Invoicing of the contracted work
What is still done by hand
- Paper slips, when the crew doesn't use the mobile module
- What travels between the contractor and site supervision: reports to approve, progress claims, variations, as PDFs or on paper
- Daywork forgotten when the invoice is drawn up
- The disputed slip, because nobody noted who asked for the work
Other cases
Variations and extra work
Extra work asked for on site, the additional offer to get approved before doing it, then to find again in the final account.
Progress claims
The payment request sent to site supervision, checked, corrected, then paid: knowing where each claim stands without chasing it by phone.
For engineering and architecture firms
The contractors' daywork reports and progress claims to check and sign within the contract's deadlines, without letting them pile up in an inbox.
Client project
For a construction group, a delivered tool follows the refresh of a flat between two tenants: prices computed from a grid, the owner's approval from a link, tradespeople notified by the general contractor, then the key handover and photos until closing.
See the delivered project→What people ask before starting
What does the SIA 118 standard say about daywork?
Daywork is done on site supervision's order; without an order, it is at the contractor's risk. The contractor draws up reports that site supervision checks and signs, and daywork is invoiced separately (art. 44 to 47 and 55). The deadline for handing in the reports depends on the contract.
Does site supervision need an account to sign?
No. It gets a link, sees the slip, the hours and the photo, then signs or comments. The signature is filed with the slip, ready for the daywork invoice.
Our site software already has a daywork module. Why bother?
If it is used on site and site supervision signs in it, nothing more is needed, and the audit will tell you so. What often remains is the crew that doesn't use it, and everything sent to the architect as a PDF or on paper.
Does the foreman have to learn new software?
The aim is that he has nothing to learn: the slip is filled in on his phone, with the same fields as the paper one, and the site photo goes with it.
Where are the slips and photos kept?
In a tool hosted in Switzerland or the EU, as you choose, with a written agreement before the project. The code and the data are yours: no per-user licence.
No specification needed. One real case is enough.
A typical email, a spreadsheet, a paper form: show the path it takes at your place. One hour, on site or by video.